Birch St (Cross Pointe to Shorey)

Phase 1: Leyburn Dr. South to Shorey Ave. 

Begins Monday, June 6, 2022

This project consists of reconstructing Birch Street between Cross Pointe Blvd to the north and Shorey Ave to the south.  In addition to street reconstruction, an 8-ft multi-use path will be installed along the east side of the road and also continue on the north side of Shorey Ave to the east where it will connect with the existing path on Camp Phillips/CR-X.  Water and sewer will also be extended along Birch St to close a gap in the existing water system to provide redundancy to the system.

Special Assesment Meeting 5/24/2022 @ 6:00 pm

Assessment Hearing Notice

Preliminary Resolution

Preliminary Assessment Report

Special Assessment Presentation (Slides)

10/7/2021 Public Information Meeting Material

Public Information Meeting Presentation

Project Plan Sheets

As a follow up to the meeting, the typical section of the street was modified to reduce the multi-use path from 10-ft wide to 8-ft wide as well as shorten the width of the ditch between the road and the trail from 11-ft to 9-ft.  This will then keep the centerline of the road where it currently is and not shift it to the west as was initially mentioned at the Public Information Meeting.